Storm Sewer Installation at Marshall and South York

The Contractor will be working at the intersection of Marshall and South York today (April  5, 2012).  They will be crossing water main and installing a manhole.  The intersection will be blocked most of the day and residents should avoid it.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s