Rotunda closed at Greenfield for bridge repair

Starting Aug. 4, Rotunda at Greenfield will be closed for bridge repair for approximately five weeks. The road will reopen on or around Sept. 8, weather permitting.

Rotunda traffic will be diverted onto the ramps over Greenfield and then back onto Rotunda.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s